登录
注册
|
海口图书馆
首页
图书资源
视听资源
本馆讯息
读书活动
校本资源
我的图书馆
全部图书资源
>
U 交通运输
>
U2 铁路运输
CRTS Ⅰ型双块式无砟轨道轨枕预制与铺设技术(英文)
暂无评分
作者:李昌宁主编
出版社:中国铁道出版社
出版日期:2017年08月
ISBN:978-7-113-23383-9
中图分类:U213.2;U238 ( 交通运输 > 铁路运输 > 铁路线路工程 > 线路构造 > 轨道 )
评分:
借阅次数:0
收藏人数:0
推荐次数:0
目录
封面
书名页
版权页
序
前言
目录页
1 Overview of CRTSⅠ Bi-block Ballastless Track Structure
1.1 CRTSⅠ Bi-block Ballastless Track Structure in Subgrade Section
1.2 CRTSⅠ Bi-block Ballastless Track Structure in Bridge Section
1.3 CRTSⅠ Bi-block Ballastless Track Structure in Tunnel Section
1.4 General Construction of CRTSⅠ Bi-block Ballastless Track
2 Prefabrication and Production of CRTSⅠ Bi-block Sleeper
2.1 Basic Structural Requirement for Sleeper Yard
2.2 Tooland Equipment Allocation
2.3 Organization and Management of Bi-block Sleeper Production
2.4 Material Management for Sleeper Yard
2.5 Construction Process Flow for CRTSⅠ Bi-block Sleeper
2.6 Operation Key Points for Critical Working Procedure
2.7 Bi-block Sleeper Construction Operation
2.8 Quality Control
3 Construction Technology Process of CRTSⅠ Bi-block Ballastless Track
3.1 General Construction Scheme
3.2 Construction Technology Process
4 Construction Preparation
4.1 Construction Documents Preparation and Review
4.2 Construction Investigation and Logistics Organization Plan Establishment
4.3 Construction Organization Design and Operation Instruction
4.4 CP Ⅲ Control Network Acceptance and Assessment
4.5 Assessment for Settlement and Deformation of Structures
4.6 Construction Personnel Trainingand Mechanical Equipment Preparation
4.7 Construction of Process Test Section
4.8 Raw Material Site Inspection and Storage
4.9 Construction Handover
5 Construction Measurement
5.1 Surveying Overall Plan
5.2 Plane Control Measurement
5.3 Elevation Control Measurement
5.4 Layout of CPⅢ Control Points
5.5 Main tenance of CPⅢ Control Network
6 Concrete Supporting Layer Construction at Subgrade Section
6.1 Basic Construction Technology Process
6.2 Technical Key Points of Slide Spreading Machine Construction
6.3 Technical Key Point of Formworking Method
6.4 Quality Standard and Control Key Points
6.5 Main Production Machine and Equipment and Testing Device
6.6 Labor Force Organization
7 Construction for Protective Layer and Convex Plate Concreteat Bridge Section
7.1 Basic Construction Technology Process
7.2 Construction Techniques Points
7.3 Main Technical Standard and Inspection Method
7.4 Main Production Machine and Equipment aswellas Testing Devices
7.5 Labor Force Organization
7.6 Quality Control for Key Links
8 Construction of Concrete Track Bed Slab
8.1 Construction Technology Process of Track Bed Slab
8.2 Construction Techniques Points
8.3 Main Construction Technical Standard and Inspection Method
8.4 Allocation of Main Construction Equipment and Inspection Instrument
8.5 Labor Force Allocation
8.6 Quality Control for Key Link
References
封底
..更多
全部评论
评论
推荐图书
@37℃女人
蠡湖吹雪著
新华出版社
“231”的情怀
王晓川编著
宁夏人民教育出版社
“5.12”受难者的挽歌——为小提琴与双钢琴而作
郝宇锴作曲
四川文艺出版社
(正德)袁州府志校注
鄢文龙,欧阳文著
暨南大学出版社
“CUPL正能量”人物访谈活动报道合集 Ⅲ
黄瑞宇主编
中国政法大学出版社
“不益惩肃之理”的法理解析
陈江著
法律出版社
“存在”的路标——以海德格尔论形而上学、无和四重整体为线索
陈光绪等著
四川文艺出版社
“创青春”创课十讲
团中央学校部等编著
清华大学出版社
©中文在线
服务条款
|
关于我们
|
管理登录
返回顶部
用户指南
下载APP
关注我们