1 Overview for CRTS Ⅱ Bi-block Ballastless Track Structure
1.1 Structure of CRTS Ⅱ Bi-block Ballastless Track on Subgrade
1.2 Structure of CRTS Ⅱ Bi-block Ballastless Track on Bridge
1.3 Structure of CRTS Ⅱ Bi-block Ballastless Trackin Tunnel
2 Prefabrication and Production of CRTSⅡ Bi-block Sleeper
2.1 Basic Structural Requirement for Sleeper Yard
2.2 Tooling Equipment Configuration
2.3 Organization Management of Sleeper Yard
2.4 Material Management for Sleeper Yard
2.5 Technical Process Flow for Sleeper Production
2.6 Operation Key Points for Critical Working Procedure
2.7 Sleeper Construction
2.8 Quality Control
3 Overall Construction Technical Flow Process
3.1 Overall Construction Program
3.2 Overall Construction Technical Flow Process
4 Construction Preparation
4.1 Construction Measurement
4.2 Personnel Training
4.3 Construction Technology Preparation
4.4 Inspection and Assessment for Ballastless Track Laying Condition
4.5 Equipment Entering Site and Acceptance
4.6 Construction Drill Organization
4.7 Setting-out and Construction Control Measurement for CP Ⅲ Track Control Network
5 Logistics Organization Planning
5.1 Sleeper Transportation and Storage
5.2 Rebar Transportation and Storage
5.3 Concrete Supply
6 Assembly and Site Transition for Mechanical Construction Equipment
6.1 Equipment Transportation
6.2 Equipment Assembly
6.3 Equipment Transferring between Lines
6.4 Equipment Transition between Sites
7 Construction Measurement
7.1 Overall Scheme for Measurement
7.2 Plane Control Measurement
7.3 Height Control Measurement
7.4 Track Installation Measurement
8 Concrete Supporting Layer Construction on Subgrade
8.1 Structure Overview
8.2 Construction Technological Process
8.3 Construction Technical Requirements
8.4 Site Operation Organization
8.5 Main Machine and Equipment Configuration
8.6 Quality Inspection and Acceptance
8.7 Quality Control
9 Concrete Base Construction on Bridge
9.1 Structure Overview
9.2 Construction Technological Process
9.3 Construction Technical Requirement
9.4 Site Operation Organization
9.5 Main Machine and Equipment Configuration
9.6 Quality Inspection and Acceptance
9.7 Quality Control
10 Concrete Track Bed Slab Construction
10.1 Structure Overview
10.2 Construction Technological Process Flow for the Mechanical Vibration and Embedded Method
10.3 Key Point of Construction Technique for Mechanical Vibration and Embedment Method
10.4 Site Operation Organization
10.5 Main Machine and Equipment Configuration
10.6 Quality Inspection and Acceptance
10.7 Quality Control
References
封底
..更多
全部评论
评论
推荐图书
@37℃女人
蠡湖吹雪著
新华出版社
“231”的情怀
王晓川编著
宁夏人民教育出版社
“5.12”受难者的挽歌——为小提琴与双钢琴而作
郝宇锴作曲
四川文艺出版社
(正德)袁州府志校注
鄢文龙,欧阳文著
暨南大学出版社
“CUPL正能量”人物访谈活动报道合集 Ⅲ
黄瑞宇主编
中国政法大学出版社
“不益惩肃之理”的法理解析
陈江著
法律出版社
“存在”的路标——以海德格尔论形而上学、无和四重整体为线索
陈光绪等著
四川文艺出版社
“创青春”创课十讲
团中央学校部等编著
清华大学出版社
©中文在线
服务条款
|
关于我们
|
管理登录
返回顶部
用户指南
下载APP
关注我们