登录 注册  |
CRTS Ⅱ型双块式无砟轨道轨枕预制与铺设技术(英文)
暂无评分 作者:李昌宁主编 出版社:中国铁道出版社 出版日期:2017年08月 ISBN:978-7-113-23410-2 中图分类:U213.2;U238 ( 交通运输 > 铁路运输 > 铁路线路工程 > 线路构造 > 轨道 )
评分: 借阅次数:0 收藏人数:0 推荐次数:0
封面 书名页 版权页 前言 目录页 1 Overview for CRTS Ⅱ Bi-block Ballastless Track Structure 1.1 Structure of CRTS Ⅱ Bi-block Ballastless Track on Subgrade 1.2 Structure of CRTS Ⅱ Bi-block Ballastless Track on Bridge 1.3 Structure of CRTS Ⅱ Bi-block Ballastless Trackin Tunnel 2 Prefabrication and Production of CRTSⅡ Bi-block Sleeper 2.1 Basic Structural Requirement for Sleeper Yard 2.2 Tooling Equipment Configuration 2.3 Organization Management of Sleeper Yard 2.4 Material Management for Sleeper Yard 2.5 Technical Process Flow for Sleeper Production 2.6 Operation Key Points for Critical Working Procedure 2.7 Sleeper Construction 2.8 Quality Control 3 Overall Construction Technical Flow Process 3.1 Overall Construction Program 3.2 Overall Construction Technical Flow Process 4 Construction Preparation 4.1 Construction Measurement 4.2 Personnel Training 4.3 Construction Technology Preparation 4.4 Inspection and Assessment for Ballastless Track Laying Condition 4.5 Equipment Entering Site and Acceptance 4.6 Construction Drill Organization 4.7 Setting-out and Construction Control Measurement for CP Ⅲ Track Control Network 5 Logistics Organization Planning 5.1 Sleeper Transportation and Storage 5.2 Rebar Transportation and Storage 5.3 Concrete Supply 6 Assembly and Site Transition for Mechanical Construction Equipment 6.1 Equipment Transportation 6.2 Equipment Assembly 6.3 Equipment Transferring between Lines 6.4 Equipment Transition between Sites 7 Construction Measurement 7.1 Overall Scheme for Measurement 7.2 Plane Control Measurement 7.3 Height Control Measurement 7.4 Track Installation Measurement 8 Concrete Supporting Layer Construction on Subgrade 8.1 Structure Overview 8.2 Construction Technological Process 8.3 Construction Technical Requirements 8.4 Site Operation Organization 8.5 Main Machine and Equipment Configuration 8.6 Quality Inspection and Acceptance 8.7 Quality Control 9 Concrete Base Construction on Bridge 9.1 Structure Overview 9.2 Construction Technological Process 9.3 Construction Technical Requirement 9.4 Site Operation Organization 9.5 Main Machine and Equipment Configuration 9.6 Quality Inspection and Acceptance 9.7 Quality Control 10 Concrete Track Bed Slab Construction 10.1 Structure Overview 10.2 Construction Technological Process Flow for the Mechanical Vibration and Embedded Method 10.3 Key Point of Construction Technique for Mechanical Vibration and Embedment Method 10.4 Site Operation Organization 10.5 Main Machine and Equipment Configuration 10.6 Quality Inspection and Acceptance 10.7 Quality Control References 封底 ..更多
推荐图书
@37℃女人
蠡湖吹雪著
新华出版社
“231”的情怀
王晓川编著
宁夏人民教育出版社
(正德)袁州府志校注
鄢文龙,欧阳文著
暨南大学出版社
“CUPL正能量”人物访谈活动报道合集 Ⅲ
黄瑞宇主编
中国政法大学出版社
“不益惩肃之理”的法理解析
陈江著
法律出版社
“创青春”创课十讲
团中央学校部等编著
清华大学出版社
返回顶部 用户指南
下载APP
关注我们